The Main Arena
With half of the grandstand missing, the arena’s technical infrastructure was reimagined from the ground up. Over 100 square metres of LED were installed as a large central screen, supported by two angled side screens, all positioned in front of the newly developed stand. This configuration ensured clear, uninterrupted coverage of live competition for spectators across the arena.
Audio coverage was designed to flex around the temporary environment. Point source speakers were deployed in the remaining Grandstand, with line array systems installed in the temporary seating, delivering consistent sound coverage to crowds of up to 15,000. Additional audio feeds covered the Pocket Bar and key viewing zones throughout the venue.
For spectators, this meant access to live scoring, commentary, and replays regardless of seating location. For sponsors, it ensured consistent, high-quality content visibility across all LED deployments, even in a significantly altered arena layout.
Broadcast & Control
Located beside the Main Arena, our OB van operated as the technical control centre for the entire event. This is where live camera feeds from across the grounds were brought together with real-time scoring, graphics, LED content control, multi-channel recording, and archiving. From here, signals were distributed to RTÉ for national live television coverage.
Site-wide audio distribution was delivered via a DANTE network, combining existing RDS IT infrastructure with a temporary fibre and switching installation provided by our team. This approach allowed announcements, commentary, and broadcast audio to be distributed reliably across the entire campus, including the temporary main arena PA system.
This level of integration, particularly within a temporary and partially redeveloped site, is only achievable through detailed planning and long-term familiarity with both the venue and the event itself.