The lighting package was one of the most extensive CT has assembled for a single ceremony in the region. The fixture list encompassed a diverse array of beam, profile, and effects units, catering to the requirements of a large stadium environment where visual impact at scale is essential.

Control was delivered via a trio of GrandMA3 full-size consoles supported by a light-size desk for focus work, with an I/O node network and seven PU L units keeping the MA session live and roaming at all times. A pre-viz station ran in session alongside the main rig, which was invaluable for a show of this complexity, where programming decisions needed to be pre-visualized before touching the live system.

The network backbone was handled by Luminex, specifically the Luminex 20T and Luminode 12, with Gigacore 10 switches rounding out the distribution. Atmospherics came courtesy of MDG. The one touring unit is positioned at multiple locations around the stadium, supported by twelve unique hazers. And then there was the following spot system: Follow-Me, running in a main-plus-backup configuration, capable of tracking up to eight targets simultaneously across any combination of fixtures in the rig.